Puget Sound Energy (PSE) is developing an integrated resource plan (IRP) that identifies how we provide cost-effective electricity to reliably meet our customers’ needs for the future. The 2021 IRP will outline PSE’s plans to eliminate coal from its electric portfolio of resources and transition to carbon free generation by 2045.

The 2021 IRP will be completed by April 2021. The Draft 2021 IRP will be available in January 2021.

The last IRP was filed in 2017. The 2019 IRP process did not result in an IRP filing. The materials from the 2019 IRP process are available along with a Progress Report which was filed with the Washington Utilities and Transportation Commission (WUTC) in November 2019. 

2017 Integrated resource plan

PSE’s 2017 Draft IRP was available September 12, 2017. The Final was filed with the Washington Utilities and Transportation Commission on November 14, 2017 and is also available at pse.com.

Information and presentations for the 2017 IRP Advisory Group meetings are available. The links below will take you to the 2017 Final Integrated Resource Plan (IRP) documents by chapter and appendix.

2017 Final Integrated Resource Plan